Skip to content
FRNLEN

Chaussée de Bruxelles 178 · 1410 Waterloo · 2025

Kitchen, Waterloo.

An 11 m² closed kitchen at Chaussée de Bruxelles 178 in Waterloo. We opened the load-bearing wall (steel beam, calculated lintel), moved the soil stack 1.80 m, pulled a secondary board and prepared supplies for an island. The kitchen fitter delivered on Tuesday; electrics and plumbing were already in. Six weeks through to the worktop joints.

Kitchen, Waterloo
Kitchen, Waterloo
Pull

Opening, wastes, island, stone.

Chaussée de Bruxelles 178, 1410 Waterloo · 6 weeks

Address
Chaussée de Bruxelles 178, 1410 Waterloo
Year
2025
Duration
6 weeks
Room
Kitchen

How this job ran.

The same four steps as every job.

  1. Visit

    We measure the existing room, the drains, the ceiling height.

  2. Plan

    Opening to the living room, soil stack moved, electrics, wastes, island, stone worktop. Kitchen fitter on Tuesday of week 5.

  3. Site

    Strip-out, then fitting. One WhatsApp number while the crew is there.

  4. Handover

    We walk the joints and the light. Both photos stay in the file.

Works carried out.

Opening to the living room, soil stack moved, electrics, wastes, island, stone worktop. Kitchen fitter on Tuesday of week 5.

  • Opening in the load-bearing wall, steel beam, lintel, plaster make-good.nSoil stack moved 1.80 m, fall checked.nSecondary 12-module board, island sockets, oven, hob, hood.nHot/cold supplies; gas capped, induction hob.nScreed and large-format tile, skirting.nKitchen fitter coordination: delivery week 5, ironmongery adjustments.nStone worktop, food-safe silicone joints.
Chaussée de Bruxelles 178, 1410 Waterloo

A similar room?

Send photos of your room. We visit, then we quote.

Ask for a visit WhatsApp